High Quality  flooring at Competitive Pricing
Contact Us  

Floor Replacement at The Double Tree

Background

Oakdale Golf Club recommended our services to the hotel. We were asked look at the hotel’s gym floor which needed replacing.

The Problem

The floor was in a basement which was damp and had been exposed to the elements for years.

Our Solution

With this being a specialist floor, we asked specialist flooring company Uzin to look at the job requirements for us and to specify materials within the standards required for a health club.

After removing the existing flooring, we abrased the surface ready for the preparations.

The process we then followed was to:

  • Apply the two specified coats of PE480 expoxy due to there being no pre-damp-membrane.

  • Apply one coat of PE280 primer.

  • Apply 152 compound for its strength to ensure it was appropriate for the wear a gym floor takes over time.

We then covered the floor with Flotex as requested. Quantum supplied the door finishing strips.

The Outcome

The client was so delighted with the quality of our work we were asked to continue the reflooring process into six treatment rooms, the corridor and the surrounding areas.

For these areas we used a slightly different process after abrasing the floor.

We used a cutting edge technology product from Murexin, MSX3 Siline which has just a three hour drying time.  This allowed us to move the project forward more quickly whilst ensuring the same quality and solid finish as the gym but at a fraction of the price.

We used three pallets of Murexin FZ15 for the whole areas.

Amtico Signature was then used as the floor covering to ensure every detail was perfect.

As always, we used Murexin as they are the quality brand that provides guarantees for both the client and the installer.

Google Rating
5.0
Based on 69 reviews
Facebook Rating
4.9
Based on 71 reviews
js_loader
Get Your Care Guide Download Now

Register your details below and we will send you the care guide shortly.

H2H Flooring are open for business - COVID safe works in place

We aim to:

  • Fully communicate requirements when we are on site
  • Carry out a full and complete service for our customers
  • Continue our high level of work whilst ensuring the safety of our staff and customers